PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Core Drilled at Stair -2 2.jpg Installing Stone panel at the 1st floor East Elevation.jpg Installing Stone panels at the East Elevation 1.jpg Installing Stone panels at the East Elevation 2.jpg Laying out block at the 1st floor EMR Room Facing South.jpg Erecting the stone panels at the East Elevation.jpg Installed duct work hangers at the 4th floor Facing North.jpg Installing Sheathing at the 4th floor Electical Room Facing West.jpg Metal Framing at the UCIA 2nd floor Facing North.jpg
Previous pageNext page Laying out block at the 1st floor EMR Room Facing South
Laying out block at the 1st floor EMR Room Facing South